OUR PROJECTS

Lithium Borate Residue Pipeline – Advisory & Owners Engineer

Project:

Jadar Lithium Borate

Client:

Rio Tinto

Scope:

Owners engineer services reviewing option for blended residue transport from a pipeline system selection, operability and constructability perspective.

Pipeline Asset:

10 km blended residue jadarite slurry pipeline

Project Phase:

Advisory

Location:

Western Serbia

Nickel Laterite : Advisory & Owners Engineer

Project:

Nickel Laterite : Advisory & Owners Engineer

Client:

Confidential

Scope:

Pipeline integrity plan and risk assessment for existing 210 nickel laterite pipeline system

Pipeline Asset:

Existing 210 km nickel laterite ore pipeline from Mine Site near the town of Moramanga to a processing plant located near Toamasina on Madagascar’s east coast.

Project Phase:

Advisory

Location:

Madagascar

Copper Concentrate/Tailings : Pre-Feasibility Study

Project:

Copper Concentrate and Tailings : Pre-Feasibility Study

Client:

Confidential

Scope:

Pre-feasibility study including pipeline route selection, system sizing and equipment selection, capital and operating cost estimate, and summary design report

Pipeline Asset:

New 15 km copper concentrate pipeline and new 5 km copper tailings pipeline system

Project Phase:

Evaluation

Location:

Indonesia

Lithium Tailings : Pre-Feasibility

Project:

Lithium Tailings Pipeline

Client:

Confidential

Scope:

Fortin Pipelines was engaged to conduct modelling and preliminary pipeline system selection for new 5.6km Lithium Tailings Pipeline

Pipeline Asset:

Lithium

Project Phase:

Evaluation

Location:

Ghana

Process Water: Advisory & Owners Engineer

Project:

Pre-Feasibility Study

Client:

Confidential

Scope:

Owners engineer and SME support for engineering design team and pre-feasibility study

Pipeline Asset:

New 65 km process water pipeline system

Project Phase:

Advisory

Location:

Western Australia

Iron Ore Tailings/Water : Advisory & Owners Engineer

Project:

Iron Ore Tailings Pipeline and Return Water Pipeline

Client:

Confidential

Scope:

Owners engineer services supporting delivery of Detail Design, Procurement Support, Construction and Commissioning

Pipeline Asset:

New 10-km iron tailings pipeline and 10-km return water pipeline system

Project Phase:

Advisory & Development

Location:

Western Australia

Iron Ore Tailings- Root Cause Analysis

Project:

Robe Valley Sustaining Project

Client:

Rio Tinto

Scope:

Completion of two detailed and technical root cause analysis reports for Rio Tinto Projects that involved the process ore stream and waste fines system at the Robe Valley mine area.

Pipeline Asset:

Process ore stream & waste fines system

Project Phase:

Asset management

Location:

Australia

Process Water- Scoping Study

Project:

Perseus Mining Meyas Sand Gold Project – Scoping Study

Client:

Perseus Mining

Scope:

Review of Scoping Study including pipeline systems, material and equipment selection, provide technical solutions on hydraulic modelling, defining Project CAPEX & OPEX, and assess the cost implications of alternate systems

Pipeline Asset:

93.6 km HDPE Raw water pipeline & mainline pump station

Project Phase:

Evaluation

Location:

Sudan – Northern Border (near Egypt)

Iron Ore Tailings – Root Cause Analysis

Project:

Mesa A

Client:

Rio Tinto

Scope:

Technical root cause analysis for the waste fines tailings pump station

Pipeline Asset:

Waste fines pipeline system, including two pump stations and 9 km DN450 pipeline.

Project Phase:

Asset management

Location:

Australia

Grange Resources (Southdown)

Project:

Southdown

Client:

Ausenco

Scope:

Pre-feasibility study update, technical review and input

Pipeline Asset:

New 108 km iron concentrate pipeline and return water pipeline from proposed Mine Site to Port of Albany.

Project Phase:

Evaluation

Location:

Australia

Iron Concentrate/Process Water – Bankable Feasibility Study

Project:

Hawsons Iron

Client:

Hawsons Iron

Scope:

Scoping Study and Bankable Feasibility Study for proposed 392 km iron concentrate and return water pipelines

Pipeline Asset:

New 392 km iron concentrate pipeline and return water pipeline from proposed Process Plant to proposed Port near Adelaide

Project Phase:

Evaluation

Location:

Australia

Process Water – Pre-Feasibility Study

Project:

Caravel Copper Project

Client:

Caravel Minerals

Scope:

Preliminary design review and audit for new 57 km process water pipeline.

Pipeline Asset:

New 57 km process water pipeline to proposed Process Plant

Project Phase:

Evaluation

Location:

Australia

Iron Concentrate, Process Water – Owners Engineer

Project:

Iron Bridge Project

Client:

Iron Bridge Joint Venture

Scope:

Responsible for design, procurement support and construction support.

Pipeline Asset:

New 22 MTPA, 132 km iron concentrate, 132 km return water from Mine Site to Port Hedland and 190 km process water pipeline from Canning Basin to Mine Site.

Project Phase:

Advisory & Implementation

Location:

Australia

Copper-Gold Tailings and Process Water- Pre-Feasibility Study

Project:

Cascabel Project

Client:

SolGold PLC

Scope:

Preliminary design for rougher and cleaner water pipeline

Pipeline Asset:

New rougher and cleaner water pipelines from the proposed Costal Plains facility to a common discharge point located 2-3 kilometres southeast of the Coastal Plains rougher facility.

Project Phase:

Evaluation

Location:

Ecuador

Lithium Borate Residue Pipeline – Advisory & Owners Engineer

Project: Jadar Lithium Borate Client: Rio Tinto Scope: Owners engineer services reviewing option for blended residue transport from a pipeline system selection, operability and constructability perspective. Pipeline Asset: 10 km blended residue jadarite slurry pipeline Project Phase: Advisory Location: Western Serbia

Nickel Laterite : Advisory & Owners Engineer

Project: Nickel Laterite : Advisory & Owners Engineer Client: Confidential Scope: Pipeline integrity plan and risk assessment for existing 210 nickel laterite pipeline system Pipeline Asset: Existing 210 km nickel laterite ore pipeline from Mine Site near the town of Moramanga to a processing plant located near Toamasina on Madagascar’s…

Copper Concentrate/Tailings : Pre-Feasibility Study

Project: Copper Concentrate and Tailings : Pre-Feasibility Study Client: Confidential Scope: Pre-feasibility study including pipeline route selection, system sizing and equipment selection, capital and operating cost estimate, and summary design report Pipeline Asset: New 15 km copper concentrate pipeline and new 5 km copper tailings pipeline system Project Phase: Evaluation…

Lithium Tailings : Pre-Feasibility

Project: Lithium Tailings Pipeline Client: Confidential Scope: Fortin Pipelines was engaged to conduct modelling and preliminary pipeline system selection for new 5.6km Lithium Tailings Pipeline Pipeline Asset: Lithium Project Phase: Evaluation Location: Ghana

Process Water: Advisory & Owners Engineer

Project: Pre-Feasibility Study Client: Confidential Scope: Owners engineer and SME support for engineering design team and pre-feasibility study Pipeline Asset: New 65 km process water pipeline system Project Phase: Advisory Location: Western Australia

Iron Ore Tailings/Water : Advisory & Owners Engineer

Project: Iron Ore Tailings Pipeline and Return Water Pipeline Client: Confidential Scope: Owners engineer services supporting delivery of Detail Design, Procurement Support, Construction and Commissioning Pipeline Asset: New 10-km iron tailings pipeline and 10-km return water pipeline system Project Phase: Advisory & Development Location: Western Australia

Iron Ore Tailings- Root Cause Analysis

Project: Robe Valley Sustaining Project Client: Rio Tinto Scope: Completion of two detailed and technical root cause analysis reports for Rio Tinto Projects that involved the process ore stream and waste fines system at the Robe Valley mine area. Pipeline Asset: Process ore stream & waste fines system Project Phase:…

Process Water- Scoping Study

Review of Scoping Study including pipeline systems, material and equipment selection, provide technical solutions on hydraulic modelling, defining Project CAPEX & OPEX, and assess the cost implications of alternate systems

Iron Ore Tailings – Root Cause Analysis

Waste fines pipeline system, including two pump stations and 9 km DN450 pipeline. Fortin Pipelines provides confidential root cause analysis for the waste fines tailings pump station.

Grange Resources (Southdown)

SME role for the review of process design, optimisation, and cost estimating of a new 108 km iron concentrate pipeline and return water pipeline from proposed Mine Site to Port of Albany.

Iron Concentrate/Process Water – Bankable Feasibility Study

Project Evaluation of a new 392 km iron concentrate pipeline and return water pipeline from proposed Process Plant to proposed Port near Adelaide

Process Water – Pre-Feasibility Study

Project Evaluation of a new 57 km process water pipeline from Gillingarra to proposed Process Plant

Iron Concentrate, Process Water – Owners Engineer

Project Development and Implementation of a new 132 km iron concentrate, 132 km return water from Mine Site to Port Hedland and 190 km process water pipeline from Canning Basin to Mine Site.

Copper-Gold Tailings and Process Water- Pre-Feasibility Study

Preliminary design for new rougher and cleaner water pipelines from the proposed Costal Plains facility to a common discharge point located 2-3 kilometres southeast of the Coastal Plains rougher facility